| Oct 30
| Uploaded Lecture 12B (on lecture page 11/13). Re-generated Lecture 13-17
pdfs to have 2 slides per page instead of 3 per page.
|
| Oct 28
| Fixed typo in lecture 11, slide 13. BDD represents multi-input
(not multi-output) function. Updated lecture slides posted.
|
| Oct 28
| Updated Exam 3 Cheat Sheet to include ITE Alg. Here's the new
Exam 3 Cheat Sheet.
|
| Oct 21
| Here's the
Exam 3 Cheat Sheet.
|
| Oct 21
| Project 2 scores posed on d2l, you have 1 week
to submit a written re-grade request. Testbenches/test cases posted
on the project page.
|
| Oct 21
| Practice Problems 7 & 8 posted on d2l. Exam 3 will cover
lectures 10-10E, 11-11B. You only need to worry about
Practice Problems 8, #1-16 & 24 for the next exam.
|
| Oct 19
| Exam 2 solution posed on
d2l, you have 1 week
to submit a written re-grade request. Here's the
breakdown.
|
| Oct 19
| Lecture 16 (course summary) re-numbered to Lecture 17.
Re-generated Lecture 15/17 to be 2 slides per page and
updated on lectures page.
|
| Oct 16
| Programming project 3 posted.
|
| Oct 7
| Lecture 10 typos on
slide3
and slide19.
Lecture slides updated accordingly.
|
| Oct 5
| Simulated Annealing
example from lecture. Also posted as "Ex3" on lecture page.
|
| Oct 1
| Posted a second set of slides for scheduling under
16-Nov. Here's a
copy.
|
| Sep 30
| Here's the
Exam 2 Cheat Sheet.
|
| Sep 30
| Updated Lecture 9,
slide 9. Hatchel provides a better description of what "maximal"
means - here
|
| Sep 28
| Office Hours for WED 30-Sep (9:30-10:30) moved to THR 1-Oct,
from 9:30 - 10:30. This is only for 30-Sep, the following week
office hours will resume to normally scheduled times.
|
| Sep 28
| Practice Problems 4, 5 & 6 Solutions posted on
d2l under the "News" tab. The material from lectures 6-9 will
be on exam 2.
|
| Sep 28
| Iterated Consensus
example from 25-Sep class. (Also posted as ex3
on the lecture tab next to 25-Sep.)
|
| Sep 23
| Exam 1 and Project 1 scores posed on d2l. Please make
sure your scores were recorded correctly. ECE574A students,
your exam is out of 60, d2l doesn't
allow me to have 2 scores for an assignment so yours shows up
out of 50.
|
| Sep 23
| Exam 1 solution posed on
d2l, you have 1 week
to submit a written re-grade request. Here's the
breakdown.
|
| Sep 23
| Project 1 grader testbenches posted, you have 1 week
to submit a written re-grade request.
|
| Sep 23
| QM example from class.
(Also posted on lecture page next to 23-Sep)
|
| Sep 21
| Project 2 posted.
|
| Sep 17
| Updated Lecture 8 slides to
a digital copy. If you want the old hand written versions, you
can get them here -
small slides
large slides
|
| Sep 16
| Updated
Problem Set 3, Question 4 Solution, we want i to iterate
from 0 to 15, NOT 0 to 16.
|
| Sep 14
| Example from class
Soda Machine FSM -> ASM, plus Four 1's Detection FSM -> ASM.
|
| Sep 14
| In class lecture 5 had 96 slides, this is because I put both
lecture 5 and
lecture 5 supplement
into a single document. Sorry
for the confusion.
|
| Sep 11
| You will be provided with a cheat sheet for exam 1 -
Cheat Sheet. There will be
no additional notes or calculators for this exam.
|
| Sep 9
| Lecture 5, Ex1 update posted - output result is 7-bits, not 4-bits.
|
| Sep 3
| ECE 574A - For project 1 the term "overflow" is used loosely.
You should use this signal to indicate any time the
result is not correct (maybe in
a subtraction operation, maybe in others?)
|
| Sep 3
| ECE 574A - For project 1 when I ask for "frequency" I'm just
asking how long it takes to propogate your result. Your can provide
either frequency or critical path.
|
| Sep 3
| Juniors and seniors, the BME graduate program will be hosting a
GEM Grad Lab. GEM is a national program, advocating and funding
graduate education for minorities in the STEM's (Science, Technology,
Engineering, and Math). See attached
flyer if you're interested.
|
| Sep 3
| Check d2l before project 1 is due to make sure your drop boxes
are setup correctly -- there should 1 folder assigned to you and
your parntner. If it isn't correct, please let me know.
|
| Sep 2
| Practice Problems 1 & 2 Solutions posted on d2l under the "News" tab.
|
| Aug 26
| If you are still looking for a partner to do the programming
projects with, please send me an email and I will try to
pair you up.
|
| Aug 26
| Just a reminder to turn in your 474/574a passport and
tryout the online submission via
D2L by Monday Aug 31.
|
| Aug 24
| Xilinx software is available in
ECE 250 and ECE 232. Labs are open M-F, 8AM-5PM.
You can also sign up in class to get extended
access (ECE 232 M-F, 7AM-10PM and Sat/Sun, 8AM-6PM).
|
| Aug 24
| Projects will be graded using the Xilinx
software available in ECE 250 and ECE 232 (version 9.2i).
While there should not be any compatability issues, you can
download this version for your machine
here.
- Click on "Previous Versions of ISE WebPACK" located in right bar
- You may need to register to get an account to login
- Download version 9.2i. You will likely want the
single file download "WebPACK_9.2i_SFD" and if
the updater doesn't automatically run, you will
also want "Service Pack 4".
|